The key steps of SMT surface mount

SMT surface mount processing is a key technology in electronic manufacturing, involving steps such as PCB production, component preparation, steel mesh printing, mounting, reflow soldering, quality inspection, cleaning and post-processing, and finished product testing.

Fast turn PCB
1. PCB production and design
The first step in SMT surface mount processing is the design and production of PCBs. The design needs to consider factors such as component layout, wiring, and solder pads to ensure the electrical performance and installability of the circuit board. After the design phase is completed, a PCB that meets the design requirements needs to be produced using professional board making equipment.
2. Component preparation
Before SMT mounting, it is necessary to carefully check the specifications, models, quality, and other information of the components to ensure that the components used meet production requirements. At the same time, the components are cleaned and dried to ensure that there are no quality issues during subsequent processing.

Fast turn PCB
3. Steel mesh printing and solder paste application
Steel mesh printing is an important step in SMT surface mount processing. Create a specialized steel mesh based on the PCB pad layout, with hollow holes corresponding to the pad positions on the mesh. Use a solder paste printing machine to evenly apply an appropriate amount of solder paste onto the solder pads of the PCB.
4. Component mounting
The mounting process is the core of SMT surface mounting technology. The surface mount machine accurately places components onto the solder paste on the PCB using a high-precision robotic arm. This step requires the surface mount machine to have high flexibility and accuracy, while also being equipped with advanced visual recognition systems to ensure the accuracy and reliability of the components.
5. Reflow soldering
After completing the component placement, the PCB board enters the reflow soldering furnace. During the heating process, the solder paste melts and cools to solidify, forming solder joints that firmly solder the components onto the PCB board.

Fast turn PCB
6. Quality inspection
After welding is completed, a series of quality inspections are required to ensure the welding quality and the precision of component mounting. The testing mainly includes appearance inspection, electrical performance testing, and other aspects. The appearance inspection mainly checks whether the mounting position, direction, inclination, etc. of the components meet the requirements; Electrical performance testing is the process of testing the electrical performance of a circuit board to ensure its proper functioning.
7. Cleaning and post-processing
After passing the quality inspection, the PCB needs to be cleaned and post treated to remove residues and stains generated during the soldering process. After cleaning, it is necessary to dry the PCB to prevent it from getting damp.

Fast turn PCB
8. Finished product testing and packaging
Finally, conduct a finished product inspection on the PCB to ensure that all components are working properly without damage or poor soldering. After passing the inspection, package for transportation and storage. The finished product inspection and packaging process is the last line of defense in the SMT surface mount processing flow, ensuring that the final product meets customer requirements.

滚动至顶部